Join Kevin Smiley, Senior Superintendent, as he walks through the University of Virginia (UVA) University Hospital Expansion project.
Kevin, a 21-year veteran of the construction industry, has spent most of his career building large healthcare projects across the Southeast. He and the UVA project team have been working on the University Hospital Expansion project since 2015, with a phased completion scheduled for 2019-2020. The videos below highlight critical aspects of the project.
Project at a Glance
Client
University of Virginia Health System
Architect
Perkins + Will
Construction Cost
$270 million new and renovation
$11 million enablement
Size
440,000-SF new
90,000-SF renovation
Delivery Method
Construction management
at risk
Completion Date
Phased completion,
2019 - 2020
LEED Certification
Silver
Link to 2019 ASHE PDC Presentation – Using Technology for Project Outcomes and Solutions
UVA Tour Introduction | Temporary Ambulance Entrance | Ambulance Relocation
Project Site Main Entrance | Project Safe Zone | Helipad Coordination | Sheer Tower
Second Floor Lobby Balcony | Prefab Electrical Closet | Main Switch Gear Room
Main Mechanical Room | Main Electrical Room | In-Wall Prefab Components
Digital Resource Station | Emergency Department | Existing Mechanical Room
Egress Discharge Stairwell (SWAM opportunity)
Healthcare COE Project Tour Part 1: 11-8-2017
Healthcare COE Project Tour Part 2: 11-8-2017
Healthcare COE Project Tour Part 3: 11-8-2017
For more information about the UVA University Hospital Expansion project you can reach out to: